Job title:
Process Technician - 2nd Shift M-F 3pm to midnight with OT as needed)
Reports to:
Operations Manager/Plant Manager
Duties and responsibilities :
- Help direct supervision of all shift employees.
- Using the production scheduling software , be able to schedule operators to specific work centers as well as manipulate scheduled production run information and create production schedules as needed through .
- Complete shift employee performance evaluations monthly
- Part file management / tool specific data management.
- Pro Scan
- Safe operation of typical material handling equipment such as a powered lift truck and pallet jack.
- Troubleshoot molding defect causes and remedy any issue using a systematic approach to process changes.
- Maintain clean, organized and safe work areas
- Understanding and implementation of company goals and objectives
- Understanding of the quality expectations of the parts molded
- Review production schedule
- Controls and monitors processes
- Maintain part files and approved process'
- Preventative tool maintenance
- Prep for the next shift
- Record downtime in QAD
- Maintain tool PM log/lot folder
- Load/unload tools from tool makers trucks (not shipping)
- Fill out supervisors notes each day
- Process monitoring log (twice per shift)
- Install/remove paperwork (at MC)
- Communicate with quality to ensure part quality
- Basic robot operation
- 5S
- Maintain the ISO9001-2015 – IATF 16949 pertinent to the production area
- FIFO
Qualifications:
- High School graduate
- Excellent attendance
- Positive Attitude
- Prior experience as an injection molding process tech
- Prior experience in a leadership role
- Excellent communication skills
- Excellent organizational skills
- Basic mathematics skills
- Safe working practices
- Powered industrial lift truck driving experience
- Computer skills
Job Type: Full-time
Pay: $28.00 per hour
Benefits:
- 401(k) matching
- Life insurance
Application Question(s):
- Name the brand(s) of injection mold presses and tonnage used
Experience:
- Hands-on plastics die setting and mold change : 4 years (Preferred)
- Plastics injection molding: 4 years (Preferred)
Shift availability:
- Day Shift (Preferred)
- Night Shift (Preferred)
Work Location: In person