Develop and maintain detailed OT/MES implementation schedules in Primavera P6 for multiple concurrent API facility projects
Create Work Breakdown Structures (WBS) specific to automation systems, MES platforms, industrial networks, and process control systems
Establish and maintain loose coupling between OT/MES schedules and master project schedules to enable independent tracking while preserving critical dependencies
Define interface points, handoffs, and integration milestones between OT/MES scope and other project workstreams (construction, process equipment, utilities, CQV)
Work closely with CQV (Commissioning, Qualification, and Validation) schedulers to align validation dependencies and testing sequences
Coordinate with master scheduler(s) on each project to ensure proper integration of OT/MES activities into overall project timelines
Participate in integrated scheduling reviews to identify cross-discipline dependencies and conflicts
Maintain consistent coding structures, calendars, and reporting standards across the scheduling team
Contribute to portfolio-level schedule analysis and reporting
Schedule automation system design, configuration, FAT/SAT activities, and deployment
Plan MES software implementation phases including system build, integration testing, and cutover activities
Coordinate industrial network infrastructure installation and commissioning (switches, firewalls, server infrastructure)
Schedule PLC/DCS programming, SCADA configuration, and system integration activities
Plan for phased go-lives and production cutover windows in coordination with plant operations
Understand and schedule around API manufacturing constraints (containment, environmental controls, batch processing)
Coordinate OT/MES activities across multiple API facilities at the Boulder site
Account for shared resources (system integrators, IT personnel, vendors) across concurrent projects
Schedule facility-specific requirements for both expansion projects and the greenfield facility
Integrate CSV (Computer System Validation) activities into OT/MES schedules
Schedule IQ/OQ/PQ, or similar, activities for automation and MES systems
Identify and communicate OT/MES-related schedule risks and mitigation strategies
Update schedules weekly based on progress from system integrators, vendors, and internal teams
Generate OT/MES-specific reports and contribute to integrated project reporting